From the course: Visio 2016 Essential Training
Unlock the full course today
Join today to access over 22,600 courses taught by industry experts or purchase this course individually.
Create dotted line report indicators
From the course: Visio 2016 Essential Training
Create dotted line report indicators
- On occasion in an organization, you may have someone reporting directly to their superior, but also indirectly reporting to someone else, a shared resource, if you will. In those cases, you can make use of the dotted-line report to show that connection as we're going to do right now with our org chart we've been building. Let's say our vacant position here, which reports to the CFO also reports occasionally to the VP of Operations. We can show a dotted-line report between these two by going over to our Shapes Pane and grabbing the dotted-line report. Now just drag it out onto the page and release. You'll see it has a start point and an end point where the arrow appears. So if the direct report is from the vacant position to the VP of Operations, we'll take the start point, which is actually called an end point, but it is the beginning. We'll drag it to either the shape itself or to an actual connection point. If you wanted to stay glued to the lower center, you could do that. Let's…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
-
-
-
-
-
-
-
(Locked)
Insert a top-level exec SmartShape3m 32s
-
(Locked)
Add manager sub-shapes1m 43s
-
(Locked)
Add other sub-shapes2m 31s
-
(Locked)
Define alternate layouts for subordinates4m 39s
-
(Locked)
Reorder team members4m 13s
-
(Locked)
Add team frames to a diagram3m 48s
-
(Locked)
Create dotted line report indicators1m 42s
-
(Locked)
Use multiple and three-position SmartShapes3m 19s
-
(Locked)
Add employee pictures4m 20s
-
(Locked)
Use synchronized copies to break down structure3m 49s
-
(Locked)
Expand and collapse reporting structure views4m 2s
-
Import data with the Org Chart Wizard8m 31s
-
(Locked)
Publish organizational charts5m 48s
-
(Locked)
-
-
-
-
-
-