From the course: SAP Transportation Management Overview
Unlock this course with a free trial
Join today to access over 22,600 courses taught by industry experts.
Planning: How it all ties together - SAP ERP Tutorial
From the course: SAP Transportation Management Overview
Planning: How it all ties together
- [Narrator] So this slide is a meager attempt at kind of showing everything all together. So we've talked about planning profiles, how you want things to be planned based on what capacity your vehicles. I should mention that if you're using booking orders, it is possible to load ocean sailing schedules or airline flight schedules or even rail schedules if it makes sense, into TM and the booking orders can take advantage of those schedules and if it's customers have an order on a particular day, the optimizer will figure out which schedule to book it on if there's capacity and if you booked capacity. Planning cost settings, so these are some of the things you can set up in the lane. The optimizer settings, they're something we talked about on the last slide. Incompatibilities, time constraints, all these are things that go into your planning settings. Then if you think back to the lesson that we did about master data, we talked about the means of transport, the truckload, driving…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
A look at TM master data in SAP4m 34s
-
(Locked)
Master data: Business partners38s
-
(Locked)
Master data: Means of transport4m 9s
-
(Locked)
Master data: Resource and driver2m 54s
-
(Locked)
Master data: Other2m 30s
-
(Locked)
Order capture: Terminology4m 13s
-
(Locked)
Order capture: Order changes2m 35s
-
(Locked)
Order capture: Other considerations1m 46s
-
(Locked)
Order capture: Process flow example2m 56s
-
(Locked)
Looking at the planning cockpit6m 45s
-
(Locked)
How the Optimizer works5m 44s
-
(Locked)
How the TM cockpit works2m 23s
-
(Locked)
Planning: How it all ties together4m 50s
-
(Locked)
TM planning: System demo10m 52s
-
(Locked)
Carrier selection and tendering9m 35s
-
(Locked)
Charge calculation components6m 19s
-
(Locked)
Charge calculation: System demo7m 45s
-
(Locked)
Freight order execution7m 40s
-
-
-