From the course: Bluebeam: Managing Construction Drawings Digitally

Unlock the full course today

Join today to access over 22,600 courses taught by industry experts or purchase this course individually.

Generating a hyperlinked drawing log

Generating a hyperlinked drawing log - Bluebeam Extreme Tutorial

From the course: Bluebeam: Managing Construction Drawings Digitally

Start my 1-month free trial

Generating a hyperlinked drawing log

- [Voiceover] So now that we've issued a set of for construction drawings and we've started adding pages to it and slip sheeting revisions, it might be helpful for us to generate a drawing log, and we can do that easily when we're working with sets because of the tag feature that's been added to Bluebeam Revu. So let's take a look at how that functions. I wanna come over here, and the first thing I need to do is open my set. So we'll open the for construction drawings set that we previously created, and again, just as a reminder, if we scroll through here, we see all of our drawings, we see our revised drawings that have been slip sheeted over the superseded drawings. And what I need to do is create a drawing log that contains all of that information. So before I can do that, I need to add one more tag because on a drawing log, I really need an issue date tag. So let's go head and add that tag by clicking on modify set and then choosing options and going to the tag tab. You can see…

Contents