Enter takeoff - Accubid Tutorial
From the course: Learning Trimble Accubid ChangeOrder
Enter takeoff
- [Instructor] Let's start performing some takeoff, or entering some items into this change notice. Click on takeoff. You'll notice this is exactly like Accubid Classic Pro, or whatever version of Accubid Classic you may be using. If you don't know how to perform takeoff, see our video on learning Accubid Classic Pro. The steps are pretty much identical. You see that you have all the different subcategories up here, like drawing, area, and phase. You get the takeoff dropdown here with all the different types of takeoff, like fixtures, heating, systems, all the way to the item database. Let's just take a few things off the item database and get them into the change order notice. Let's put a little conduit. A little three quarter EMT maybe. 50 feet. Maybe some elbows, four of them. I'll pick some connectors. Steel set screw, my favorite, four of them. Gonna need some couplings, of course. 10. How about some wire? Some number 12. Let's say 150 feet. I think you get the point of what I'm…
Contents
-
-
-
The home screen1m 31s
-
(Locked)
About settings and options1m 17s
-
(Locked)
Global default job2m 33s
-
(Locked)
Create a project3m 54s
-
(Locked)
Create a CCN2m 27s
-
(Locked)
Enter takeoff4m 48s
-
(Locked)
Price material3m
-
(Locked)
Direct labor screen1m 32s
-
(Locked)
Indirect labor screen59s
-
(Locked)
General expenses screen1m
-
(Locked)
Equipment screen1m 6s
-
(Locked)
Subcontractors screen1m 25s
-
(Locked)
Unit price screen1m 12s
-
(Locked)
Quoted material screen57s
-
(Locked)
The total screen1m 2s
-
(Locked)
Graph and quote pad screens1m 8s
-
-
-